IEC provided Engineering, Procurement, and Construction (EPC) services for installation of photovoltaic (PV) systems at two (2) school sites within the Antelope Elementary School District (AESD) District: Antelope Elementary School and Berrendos Middle School. As part of the project, IEC analyzed energy usage across the District and performed a rate analysis to determine the optimal utility rate schedule for each school site. The solar installations consist of PV modules installed on fixed-tilt ground mounted structures.