![IEC engineered design change packages for the replacement of two emergency generators and supervised the new installations.](https://assets-global.website-files.com/6244e2ab601fe2ffd45be8d1/63e6e23f8cfec2682e54a547_pg-design-08-loon-luvhf_400px.jpg)
IEC engineered design change packages for the replacement of two emergency generators and supervised the new installations. The packages replaced a 240kW diesel engine generator at Loon Lake powerhouse with a 360kW Kohler diesel unit, and a 60kW gasoline engine generator at Union Valley with a 140kW Cummins propane unit. The designs interfaced new 24 VDC circuits with existing 125 VDC control, alarm, and transfer circuits. IEC also generated and conducted test procedures for the auto-start and transfer after loss of offsite power.