Power Studies and Analysis

Power Studies and Analysis

Engineering Services for Design, Analysis and Specification Preparation for Generation Assets and Supporting Infrastructure

SMUD awarded to IEC to provide multidisciplinary engineering support all of SMUD’s generation projects on an as-needed basis.

CLIENT:

SACRAMENTO MUNICIPAL UTILITY DISTRICT

This contract with the SMUD Generation Operations Department was again awarded to IEC to provide multidisciplinary engineering support to all of SMUD’s generation projects on an as-needed basis. SMUD’s generation plants include gas-fired plants powered by a variety of turbines, wind plant facilities, hydroelectric facilities, and solar arrays. Work Authorizations: Work Authorizations, in order of assignment, have so far included:

  • Solano Wind Project Tax Benefit Technical Support
  • Co-Gen Plant RTU Upgrade Project
  • Gas Pipeline DOT Compliance Audit Support
  • McClellan CT Repair
  • UARP Governor/TSV Controls Upgrade and McClellan Controls Upgrade Projects DCN Packages
  • Gas Pipeline Flow Study
  • Business Continuity and Continuity of Operations Plans
  • Environmental and Preliminary Engineering Services for LM6000 Fleet Upgrades
  • Air Quality Compliance Audits
  • Due Diligence on Sacramento County Airport’s CHP and CUP system
  • RTU Upgrade for Power Generation Facilities
  • Solano Wind Project Meteorological Services
  • Landfill Gas for Combustion Turbines Feasibility & Cost Estimating
  • CVFA Digester Gas Processing
  • CVFA/CPP Digester Gas Air Quality Support
SMUD awarded to IEC to provide multidisciplinary engineering support all of SMUD’s generation projects on an as-needed basis.
SMUD awarded to IEC to provide multidisciplinary engineering support all of SMUD’s generation projects on an as-needed basis.